Updated On: 25 March, 2025 05:43 PM IST | Mumbai | mid-day online correspondent
The Central Railway's Mumbai Division will operate special traffic and power block on the up and down south-east lines, for de-launching of 4 girders of existing Road Over Bridges

The block will be operated between 01.30 hrs of 30.03.2025 (Saturday/Sunday midnight) to 04.30 hrs of 30.03.2025 (Sunday early morning), the Central Railway said
The Central Railway, while sharing Mumbai local train updates, on Tuesday said that it will operate traffic and power block on March 29 for de-launching of girders of existing Road Over Bridge (ROB) between Kalyan and Badlapur stations.
An official statement said that the Central Railway's Mumbai Division will operate special traffic and power block on the up and down south-east lines, for de-launching of 4 girders of existing Road Over Bridges (ROB) at kms 62/880 using two road cranes, for construction of new pipeline bridge between Kalyan and Badlapur on the intervening night of March 29 and March 30 (Saturday / Sunday night).