Updated On: 11 March, 2025 10:46 AM IST | Mumbai | Rajendra B. Aklekar
The land parcel belongs to the railways and was to be utilised for the now-abandoned 5th and 6th line expansion project. When mid-day visited the spot, between the WR main lines and Bandra Terminus, last week to check the status of the abandoned alignment, the entire stretch seemed to have been progressively and systematically encroached

The settlement in Bandra East. Pic/Rajendra B. Aklekar
A slum colony that could rival the scale of clusters of shanties in Bandra East is quietly mushrooming on railway premises under the nose of Western Railway (WR). The abandoned fifth and sixth railway corridor is being readied for occupation with makeshift cloth tents dotting Ghas Bazar Road near the Bakar Kasai Kabristan and Hindu cremation ground.
When mid-day visited the spot, between the WR main lines and Bandra Terminus, last week to check the status of the abandoned alignment, the entire stretch seemed to have been progressively and systematically encroached.