Updated On: 07 January, 2025 02:05 PM IST | Mumbai | A Correspondent
The final 76 km stretch of the Samruddhi Highway, connecting Igatpuri to Amane near Bhiwandi, is set to open by the end of February, allowing motorists to travel non-stop from Mumbai to Nagpur while avoiding traffic on the old Mumbai-Nasik Highway

File Pic
Good news for motorists heading towards Nasik and Nagpur from Mumbai and Thane: The final 76-kilometre stretch of the Samruddhi Highway, connecting Igatpuri to Amane near Bhiwandi, is expected to be opened to traffic by the end of February. Amane village, where the Samruddhi Highway will begin, is located 53 kilometres from Mumbai.
An MSRDC official stated, "The work on the 76-kilometre stretch, which will link Igatpuri to Amane, is 99 per cent complete. The final stretch had to be constructed through challenging terrain, and it includes 16 bridges and five tunnels. By the end of February, we will apply the final touches, allowing motorists to travel non-stop from Amane in Bhiwandi to Nagpur."